Electromagnetic Interference Between Transmission Lines and Buried Pipelines 2016/02/15
For the company, ENGIE Lab Laborelec, we at POWERSYS performed an electromagnetic interference study, in order to evaluate the influences of three transmission lines (220 kV and 70 kV) on a buried gas pipeline. This is according to the standards ITU-T K33 and IEC 60479-1. Different kinds of installations (metallic pipelines, telecommunication systems, power systems) […]